Projects

Underground subway project

L&T UGC 01 Underground Subway Construction

(Connecting Mantralaya to Vidhan Bhavan Metro Station)

This underground subway construction project, executed by L&T, required advanced injection grouting solutions to ensure structural integrity and waterproofing. A mock-up was done using AVINJECT 2C PU-PW, demonstrating its effectiveness in stabilizing and sealing critical sections.

Below are before-and-after visuals showcasing the transformation.

Before Injection Grouting

After Injection Grouting

Metro Tunnel Waterproofing

L&T MML 03 UGC 07

Mumbai, India

Sealed underground metro tunnels using high-performance hydrophobic resins, preventing seepage and enhancing structural durability.

Solution used: AVINJECT 116 EF, AVINJECT 2C ACRYL-R

AVINJECT Products are approved by MMRC & MMRDA. Our AVINJECT 116 EF (single component & hydrophobic in nature) & AVINJECT 2C ACRYL R is being used at L&T Package 07 site. Below is the image of the work done.

Commercial and Residential projects

Kendriya GST Parisar

Kharghar, Maharashtra

Injected flexible acrylate solutions to stop persistent water leaks in walls, staircases, and residential flats, ensuring long-term protection.

Solution Used: AVINJECT 2C ACRYL-R, AVINJECT 1C Elasto

A Residential complex for central GST Employees. This project consists of seepages from the walls. The
complex consisting of 4 wings & on each floor there are 4 flats & from each flat there is a seepage as well
as seepages from the staircase passage. We successfully stop the seepage using our acrylate injection
product name AVINJECT 2C ACRYL-R & AVINJECT 1C Elasto.

Below is the image of work done.

Infrastructure Sealing

Mumbra / Airoli Tunnel

Maharashtra, India

Applied PU & silicate injections to reinforce tunnel walls, prevent water ingress, and improve tunnel longevity under extreme conditions.

Solution Used: AVINJECT 2C PU-PW, AVINJECT 2C URESIL FOAM

A Project that connects Mumbra to Airoli consist of twin tunnels of length 1 km each. And out of twin
tunnel the left-hand tunnel is recently achieved the throughout passage, we successfully carried out PU &
silicate-based Injection product. We used two component PU product named AVINJECT 2C-PU-PW &
Two component Silicate product named AVINJECT 2C URESIL FOAM. AVINJECT PRODUCTS
HAVE BEEN APPROVED BY MMRDA.

Below is the image of work done.

LIST OF FEW PROJECTS DONE BY OUR APPLICATOR

  1. SMC Airoli – Mumbra Road Tunnel Project under MMRDA
  2. L&T Coastal Road Tunnel Project
  3. L&T MML 03 Tunnel & Station works
  4. Airport Express Metro Link Project- 20m under DMRC
  5. Banihal Road Tunnel Project – 25m- Jammu